← All Insights

Clio & analytics

Older Unbilled Work: Find What Is Holding Up the Bill

Old work and a stalled approval are different problems. Use WIP aging to select records for review, then check the billing stage before deciding what should happen next.

Keeney Analytics Editorial · · 4 min read

Older unbilled work deserves a question, not an automatic instruction to invoice it. Some entries may be waiting for an agreed billing milestone. Others may already sit on a draft bill or in an approval queue. The same age can conceal very different next steps.

A focused work-in-progress review helps distinguish those situations. Use the report to choose what to investigate, then confirm the reason with the person responsible for the matter. The aim is to remove avoidable delays while respecting the actual billing arrangement.

Understand what is inside WIP

Clio's work-in-progress report documentation says the report includes time and expense activities not on a bill, plus activities on draft and pending-approval bills. It excludes activities on approved and paid bills. That means generating a draft alone does not necessarily remove work from WIP.

In Keeney Analytics, Work in Progress reporting shows current unbilled time and expenses, including draft and pending bills, with work-age bands. It is a current sync snapshot, not a forecast of collections. The reporting documentation also distinguishes WIP values from amounts after invoice discounts and tax.

Before discussing an item, record when the source data was synced and what scope you reviewed. If a colleague has just changed a bill in Clio, a previously generated view may describe an earlier state. Keep the observation and the current source record separate until you have checked them.

Separate the age of work from the length of a delay

An entry's work date tells you when the work occurred. It does not tell you how long a bill has awaited approval, when the client agreed to be billed, or whether someone missed a deadline. Avoid treating every older entry as evidence that the billing team is slow.

Consider a hypothetical matter with work performed six weeks ago and a draft prepared yesterday. The work is six weeks old, but that does not establish six weeks of approval delay. A useful investigation asks why billing started yesterday and what needs to happen now.

Start with a small group of older items that the team can actually resolve. For each, write down the work date, current billing stage, known reason for waiting, and the person who can confirm that reason. These are suggested review fields, not a claim that every field is automatically available in a dashboard.

Check the bill stage in Clio

Clio's bill-state guide directs users to Billing or a matter's Bills subtab, where Draft and Pending approval filters help locate bills at those stages. Pending approval is distinct from Unpaid: an approved unpaid bill is ready to send to the client.

If the item is on a draft, ask whether the description, amounts, and supporting information are ready for review. If it is pending approval, confirm who needs to act and what question remains unresolved. If it is not yet on a bill, establish whether preparation should begin under the matter's billing arrangement.

Do not generate another bill merely because an activity appears in WIP. First establish whether it is already included in a draft or pending bill. Likewise, do not bypass a review step just to reduce the reported balance. The useful outcome is an accurate billing decision.

Turn each explanation into a specific action

Use a short action note rather than a general request to clear old WIP. A missing explanation needs clarification from the person who recorded the work. An incomplete draft needs a named preparer. A billing milestone that has not occurred needs a review trigger, rather than repeated reminders to send an invoice.

For a hypothetical held item, the note might say that the matter owner will confirm whether the agreed milestone has occurred at the next scheduled review. For an approval item, it might identify the reviewer and the outstanding question. These examples describe an internal routine, not automated Keeney Analytics classifications.

Keep decisions about corrections or reductions with the appropriate person. A smaller balance achieved by changing records without a justified decision is not evidence of a better billing process.

Check what changed, not just whether WIP fell

At the next review, revisit the same selected items. Did the required clarification arrive? Was the bill reviewed? Does the hold still have a valid reason? Explain departures from the list before calling them successful billing.

Keeney Analytics Reports supports PDF and CSV exports, with source timestamps and measurement notes. Preserve the review evidence when needed; saved configurations remember choices rather than a frozen report. New work and changes to existing records can move the current total between reviews.

A useful first result is a smaller list of unexplained holds and a clear owner for every remaining decision. Billing and subsequent payment still need their own checks. Work-age bands help you find the questions; the underlying records and matter context determine the answers.

Sources & further reading